About this service visit
In Chattanooga, a successful inspection and repair job was carried out, involving the replacement of 20 dry sprinkler heads in compliance with NFPA standards due to failing UL sample tests. The process required strict adherence to clock-in and clock-out protocols, alongside a mandatory 72-hour notice for scheduling. All deficiencies were documented, and necessary signatures were obtained to ensure the work was comple
\~ Replacement of (20) dry sprinkler heads are required per NFPA due to failing UL sample testing. **Clock in & Clock out Mandatory for Payment** • Clock in Process – You must clock in and out by calling Century 360 at ([redacted-phone] to check in and out. Call ([redacted-phone] before leaving loca
Project snapshot
- Service: inspection_repair
- Location: Chattanooga, TN