About this service visit
In Chattanooga, a thorough inspection and repair job was completed on a dry system. The team replaced five busted drum drips and repaired four leaks in the attic. A three-year air leak test was performed post-repairs. The process emphasized the importance of proper scheduling and documentation, ensuring all deficiencies were addressed and reported accurately. Visual evidence of the work was captured for compliance an
\~Replace (5) busted drum drips on dry system \~ Repair (4) leaks in attic on dry system \~ Perform 3-year air leak test once leaks are repaired. -If this location has a dry system, please locate, and note location of drum drips on your report. \*\*If any additional material, labor, permitting or ju
Project snapshot
- Service: inspection_repair
- Location: Chattanooga, TN
Need help with a similar issue?
Contact our team to schedule an inspection, repair, or service visit.