About this service visit
In Chattanooga, a successful inspection and repair job was carried out, involving the replacement of 20 dry sprinkler heads due to failing UL sample testing. Compliance with NFPA standards was ensured, and the process required mandatory clock-in and clock-out procedures. All deficiencies were documented, and a signed work order was obtained from the Manager on Duty. This meticulous approach guarantees safety and adhe
\~ Replacement of (20) dry sprinkler heads are required per NFPA due to failing UL sample testing. **Clock in & Clock out Mandatory for Payment** • Clock in Process – You must clock in and out by calling Century 360 at ([redacted-phone] to check in and out. Call ([redacted-phone] before leaving loca
Project snapshot
- Service: inspection_repair
- Location: Chattanooga, TN