About this service visit
In Chattanooga, a successful inspection and repair job was carried out, involving the replacement of 20 dry sprinkler heads as mandated by NFPA due to failing UL sample tests. The process required strict adherence to clock-in and clock-out procedures, with a mandatory 72-hour notice for scheduling. All deficiencies were addressed on-site, and proper documentation was ensured for compliance and payment processing.
\~ Replacement of (20) dry sprinkler heads are required per NFPA due to failing UL sample testing. **Clock in & Clock out Mandatory for Payment** • Clock in Process – You must clock in and out by calling Century 360 at ([redacted-phone] to check in and out. Call ([redacted-phone] before leaving loca
Project snapshot
- Service: inspection_repair
- Location: Chattanooga, TN
Need help with a similar issue?
Contact our team to schedule an inspection, repair, or service visit.