About this service visit
In Chattanooga, our team completed the replacement of three inoperable exit lights following a failed inspection. The job required adherence to IVR compliance for payment processing. Technicians utilized the mobile Service Channel GPS app for check-in and check-out, ensuring all protocols were followed. Pictures documenting the repairs were submitted as part of the compliance process. This service enhances safety and
Replace (3) Exit Lights due to being inoperable and failing test / inspection **IVR Mandatory for Payment** IVR Process - Please use the mobile Service Channel GPS app or call ([redacted-phone] from the STORE phone to check in and out. PIN# 1388023 and the tracking/customer PO# is on the attached wo
Project snapshot
- Service: inspection_repair
- Location: CHATTANOOGA, TN
Need help with a similar issue?
Contact our team to schedule an inspection, repair, or service visit.